Monday, October 20, 2008
Final Day
Friday brought dramatic gray clouds that finally produced showers. But nothing was going to stop us except a downpour. The sheathing for the house was completed (an estimated 104 nails per 4' x 8" board!) Maureen and Dwight had to remove and replace board from one corner and can attest to how firmly everything is nailed together!
Then the basic frame for the porch roof went up with many hands to help with the heavy lifting. Two molded bath tub enclosures were delivered and put in place. Too bad they weren't hooked up to water to sluices us down!
Glenn and Chuck went around installing bracing and squaring exterior and interior corners in preparation next week for installing the roof framing.
All in all a dramatic end to four days of work - from cement slab to walls and shed.